Wastewater treatment project

Wastewater Reuse System at Seheung Factory

Wastewater Reuse System at Seheung Factory

Applied technology: Ozone technology is used to treat color and COD.

Capacity: 100 m³/day

After treatment, the wastewater meets QCVN 40:2011/BTNMT, Column A standards.

Contact us for further consultation.

Wastewater Reuse System for VN Food Factory

Wastewater Reuse System for VN Food Factory

Applied technologies: Solids separation, self-cleaning filtration, UF system, and NF system.

Capacity: 10 m³/h

After treatment, the water meets QCVN 01:2009/BYT standards.

Contact us for further consultation.

BONG SEN PRE-SCHOOL

Rehabilitation of Domestic Wastewater Treatment System – Capacity: 20 m³/day

Applied technology: AO process (anoxic and aerobic)

After treatment, the wastewater meets QCVN 14:2008/BTNMT, Column B standards.

Contact us for further consultation.

TAN HUNG THUAN PRE-SCHOOL

Domestic Wastewater Treatment System – Capacity: 5 m³/day

Applied technology: AO process (anoxic and aerobic)

After treatment, the wastewater meets QCVN 14:2008/BTNMT, Column B standards.

Contact us for further consultation.

Domestic Wastewater Treatment System – Topaz Building

Rehabilitation of Domestic Wastewater Treatment System – Topaz Building

Applied technology: AO process

Capacity: 360 m³/h

After treatment, the wastewater meets QCVN 14:2009/BTNMT, Column B standards.

Contact us for further consultation.

Shrimp Pond Wastewater Reuse System

Shrimp Pond Wastewater Reuse System

Applied technologies: Constructed wetland system, bio-pond with media, and ozone system for water disinfection before reusing in shrimp ponds.

Wetland capacity: 50 m³/day
Ozone system capacity: 80–100 m³/h

After treatment, the water meets the input water quality standards for shrimp ponds according to QCVN 02-19:2014/BNNPTNT.

Contact us for further consultation.

Rice Vermicelli Production Wastewater Treatment System

Rehabilitation of Rice Vermicelli Production Wastewater Treatment System – Nha Trang

Applied technologies: Biogas, physico-chemical treatment, and AO process

Capacity: 8 m³/day

After treatment, the wastewater meets QCVN 40:2011/BTNMT, Column B standards.

Contact us for further consultation.

Electroplating Wastewater Treatment System

Electroplating Wastewater Treatment System – Binh Duong

Applied technologies: Physico-chemical treatment and pressure filtration

Capacity: 50 m³/day

The treated wastewater meets QCVN 40:2011/BTNMT, Column A standards.

Contact us for further consultation.

Wastewater Treatment System for swine Farm

Installation and Operation of Wastewater Treatment System for Thai Viet Swine Farm – Binh Phuoc

Applied technologies: Biogas, AO process, and physico-chemical treatment

Capacity: 330 m³/day

The treated wastewater meets QCVN 62:2016/BTNMT, Column B standards.

Contact us for further consultation.

Wastewater Treatment System for snow Farm

Installation and Operation of Wastewater Treatment System for Dehus Sow Farm – Dak Lak

Applied technologies: Biogas, AO process, physico-chemical treatment, and pressure filtration

Capacity: 550 m³/day

The treated wastewater meets QCVN 62:2016/BTNMT, Column A standards.

 

Contact us for further consultation.

Wastewater Treatment System for Nhon Hoa Industrial Park

Installation and Operation of Wastewater Treatment System for Nhon Hoa Industrial Park – An Nhon

Applied technologies: Physico-chemical treatment and AO process

Capacity: 2,000 m³/day

The treated wastewater meets QCVN 40:2011/BTNMT, Column B standards.

Contact us for further consultation.

Wastewater Treatment System for the Urban Area

Installation and Operation of Wastewater Treatment System for the Urban Area of Loc Ninh Administrative, Commercial, and Residential Center

Applied technologies: AO process and pressure filtration

Capacity: 300 m³/day

The treated wastewater meets QCVN 14:2008/BTNMT, Column B standards.

Contact us for further consultation.

Wastewater Treatment System for Lavita Charm

Installation and Operation of Wastewater Treatment System for Lavita Charm High-Rise Apartment – Thu Duc, Ho Chi Minh City

Applied technology: AO process

Capacity: 1,003 m³/day

The treated wastewater meets QCVN 40:2011/BTNMT, Column B standards.

Contact us for further consultation.

Wastewater Treatment System for Tan An Huy Residential Area

Installation and Operation of Wastewater Treatment System for Tan An Huy Residential Area – Phuoc Kieng, Nha Be

Applied technologies: AO process and pressure filtration

Capacity: 1,200 m³/day

The treated wastewater meets QCVN 14:2008/BTNMT, Column B standards.

Contact us for further consultation.

Nguyen Trung Ngan School

Flood Control Pumping System – Nguyen Trung Ngan School, District 8 – Ho Chi Minh City

Applied technologies: Collection sump and submersible drainage pumps

Capacity: 120–240 m³/h

Designed for flood prevention during high tides and heavy rainfall

Contact us for further consultation.

An Binh School

Flood Control Pumping System – An Binh School, District 8 – Ho Chi Minh City

Applied technologies: Collection sump and submersible drainage pumps

Capacity: 120–240 m³/h

Designed for flood prevention during high tides and heavy rainfall

Contact us for further consultation.

Rehabilitation of Domestic Wastewater Treatment System

Rehabilitation of Domestic Wastewater Treatment System – Long An Tobacco Factory

Applied technologies: Collection pipeline and AO wastewater treatment system

Capacity: 20 m³/day

The treated wastewater meets QCVN 40:2011/BTNMT, Column A standards.

Contact us for further consultation.

Supply and Installation of Domestic and Industrial WWTP

Supply and Installation of Domestic and Industrial Wastewater Treatment System – Hai Minh Factory (X51)

Applied technologies: Collection pipeline and AO wastewater treatment system

Capacity: 155 m³/day

The treated wastewater meets QCVN 40:2011/BTNMT, Column B standards.

 

Contact us for further consultation.